Game Icon
Road Maintenance Simulator
Platform
ONESeries
Achievements
1 / 50
Gamerscore
G 20 / 1,000
Last Activity
April 8th, 2022
2% complete
Trash Picker
Trash Picker
Mission “Clean-up Road Shoulder – Federal Road” complete.
G 20
✓ April 8th, 2022
16.2% · Common
Traffic Beacon
🔒
Traffic Beacon
Mission “Cordon-off Work Area – County Road” complete.
G 20
15.9% · Common
Stop
🔒
Stop
Mission “Align Signs – Road Network” complete..
G 20
9.3% · Rare
Delineator right
🔒
Delineator right
Mission “Put Up Delineators – County Road” complete.
G 20
16.2% · Common
Delineator left
🔒
Delineator left
Mission “Put Up Delineators – Federal Road” complete.
G 20
16.3% · Common
Wheelbarrow
🔒
Wheelbarrow
Fully load up wheelbarrow.
G 20
48.5% · Common
Right of way
🔒
Right of way
Mission “Put Up Signs – Road Network” complete.
G 20
9.2% · Rare
Screw
🔒
Screw
Mission “Replace Guardrail – County Road” complete.
G 20
11.3% · Common
Screwdriver
🔒
Screwdriver
Mission “Replace Guardrail – Federal Road” complete.
G 20
10.9% · Common
Guardrail
🔒
Guardrail
Mission “Replace Guardrail – Highway” complete.
G 20
11.6% · Common
Hand broom
🔒
Hand broom
Mission “Clean-up Road Shoulder – County Road” complete.
G 20
16.3% · Common
Traffic Beacon with light
🔒
Traffic Beacon with light
Mission “Cordon-off Work Area – Federal Road” complete.
G 20
15.4% · Common
Broom
🔒
Broom
Mission “Clean-up Road Shoulder – Highway” complete.
G 20
16.8% · Common
Drop of water
🔒
Drop of water
Mission “Clean Guardrail – County Road” complete.
G 20
16.6% · Common
Foam
🔒
Foam
Mission “Clean Guardrail – Federal Road” complete.
G 20
14.2% · Common
Jet of water
🔒
Jet of water
Mission “Clean Guardrail – Highway” complete.
G 20
14.1% · Common
Hole
🔒
Hole
Mission “Fix Asphalt – County Road” complete.
G 20
17.3% · Common
Bucket
🔒
Bucket
Mission “Fix Asphalt – Federal Road” complete.
G 20
16.6% · Common
Scissors
🔒
Scissors
Mission “Trim Trees – County Road” complete.
G 20
22.0% · Common
Saw
🔒
Saw
Mission “Trim Trees – Federal Road” complete.
G 20
22.5% · Common
Brush
🔒
Brush
Mission “Mark Lanes – County Road” complete.
G 20
20.0% · Common
Spray can
🔒
Spray can
Mission “Mark Lanes – Federal Road” complete.
G 20
19.8% · Common
Barrier
🔒
Barrier
Mission “Cordon-off Work Area – Highway” complete.
G 20
14.0% · Common
Tar
🔒
Tar
Mission “Tar Road – County Road” complete.
G 20
17.8% · Common
Thumbs up
🔒
Thumbs up
All different missions completed once.
G 20
2.4% · Rare
10
🔒
10
10 missions completed.
G 20
13.7% · Common
25
🔒
25
25 missions completed.
G 20
3.1% · Rare
50
🔒
50
50 missions completed.
G 20
1.3% · Rare
100
🔒
100
100 missions completed.
G 20
1.1% · Rare
Battering Ram
🔒
Battering Ram
NPC vehicle rammed.
G 20
63.7% · Common
Boot print
🔒
Boot print
100 traffic beacon bases put up.
G 20
1.5% · Rare
Boots prints
🔒
Boots prints
100 traffic beacon bases dismantled.
G 20
1.5% · Rare
Hand
🔒
Hand
100 delineators aligned.
G 20
1.1% · Rare
County Road
🔒
County Road
Mission “Remove Cordon – County Road” complete.
G 20
15.5% · Common
Reflector
🔒
Reflector
50 delineators put up.
G 20
1.1% · Rare
Attention
🔒
Attention
100 signs aligned.
G 20
0.9% · Rare
Dumpster
🔒
Dumpster
20 broken guardrails disposed.
G 20
1.4% · Rare
Trash bag
🔒
Trash bag
100 full trash bags disposed.
G 20
1.5% · Rare
Washing machine
🔒
Washing machine
50 guardrails cleaned.
G 20
1.4% · Rare
Jackhammer
🔒
Jackhammer
Fixed asphalt 15 times.
G 20
0.9% · Rare
Sun
🔒
Sun
50 trees trimmed.
G 20
1.0% · Rare
Straight line
🔒
Straight line
100 lines marked.
G 20
1.0% · Rare
Bin
🔒
Bin
15 roads tarred.
G 20
0.9% · Rare
Intersection
🔒
Intersection
100 signs put up.
G 20
0.9% · Rare
Federal Road
🔒
Federal Road
Mission “Remove Cordon – Federal Road” complete.
G 20
14.4% · Common
Vehicle
🔒
Vehicle
All vehicles used.
G 20
22.5% · Common
Highway
🔒
Highway
Mission “Remove Cordon – Highway” complete.
G 20
13.1% · Common
Turn right
🔒
Turn right
Mission “Align Delineators – County Road” complete.
G 20
15.4% · Common
Turn left
🔒
Turn left
Mission “Align Delineators – Federal Road” complete.
G 20
15.5% · Common
Straight ahead
🔒
Straight ahead
Mission “Align Delineators – Highway” complete.
G 20
10.6% · Common